|
1. The pool layout is carefully marked for precision. |
|
|
2. The dig begins the process for perfection.
|
|
|
3. The hole is carefully prepared to achieve proper shape and depth. |
|
|
4. Now that the parameters are correct, the pool is ready to be set in place. |
|
|
5. The timely process of filling the pool with water begins. |
|
|
6. The proper plumbing and electrical equipment is installed. |
|
|
7. The concrete is poured around the pool and its foundation. |
|